Case Studies
Fujiang Bridge Night Lighting, Deconstructed
A 603 m tied-arch bridge is not lit by one luminaire but by five separate jobs: the arch expresses volume, the hangers rhythm, the girder a continuous edge, the piers an anchor, and 2,637 guardrail luminaires serve the deck. Read against the design documents and the as-built schedule.
Read article